Practical thinking from the COREXION team on cost, design, construction and handover, drawn from the way projects are actually delivered.

Latest insight
PROJECT CONTROLS

Why lower payments alone don't prove savings

A project that is paying less this month is not necessarily spending less overall. Savings are proven by the forecast at completion, not by the cash curve.

By the COREXION team · 2 min read
Read article›
All insights

Thinking from the field

VALUE ENGINEERING

When a cheaper substitution costs more

A lower unit rate is only the start of the story. The real comparison is net value across function, transition cost, whole-life cost and risk.

COREXION team · 2 min readRead article›
HANDOVER

Completion, handover and readiness to operate are not the same milestone

A building can be physically complete and still not ready to open. Treating three distinct milestones as one is a common cause of late, disputed handovers.

COREXION team · 2 min readRead article›
CONSTRUCTION MANAGEMENT

Progress reports that mask exposure

A progress percentage can look healthy while cost and time risk build up underneath. Verified progress, based on accepted work, tells the real story.

COREXION team · 2 min readRead article›
PROJECT MANAGEMENT

Mobilization gates: starting a project on a dependable baseline

The first weeks of an appointment decide how reliable everything after them will be. Five gates turn a handover of documents into a working baseline.

COREXION team · 2 min readRead article›
PROJECT MANAGEMENT

Risk management that changes decisions

A risk register is only useful if it changes what the project does. Every risk needs an owner, a trigger and a response that is checked for effect.

COREXION team · 2 min readRead article›
DESIGN MANAGEMENT

Controlled design release: protecting the brief from drawing to site

Late or inconsistent design information is one of the main causes of delay and cost growth. Coordinated, controlled release keeps the brief intact all the way to construction.

COREXION team · 2 min readRead article›
CONTRACTS

Contracts and claims: evidence before entitlement

Claims are won and lost on records made at the time, not arguments made later. A disciplined process protects both the client's position and the working relationship.

COREXION team · 2 min readRead article›
PROJECT CONTROLS

Schedule recovery: keep the baseline, the forecast and the plan distinct

When a project slips, the temptation is to redraw the programme. Real recovery starts by keeping three things separate: what was planned, what is now likely, and what it would take to recover.

COREXION team · 2 min readRead article›
INFORMATION MANAGEMENT

Receipt, review, approval and authorization are different events

Many site errors start in the document register, not on site. Controlled information means everyone knows which version is current and what it may be used for.

COREXION team · 2 min readRead article›