Why lower payments alone don't prove savings
A project that is paying less this month is not necessarily spending less overall. Savings are proven by the forecast at completion, not by the cash curve.

A building can be physically complete and still not ready to open. Treating three distinct milestones as one is a common cause of late, disputed handovers.

The contractor declares the works complete. The client expects to start operating next week. The operator has not been trained, the as-built drawings are missing and two life-safety tests are still open. This gap is predictable, and it can be planned out.
Each has its own evidence and its own owner. Merging them hides the work still needed between them.
We track handover as five streams, starting well before completion:
Safety and essential-function blockers stay visible until they are closed, whatever the programme says. Where handover is phased, the boundaries between areas are documented and each acceptance is authorized.
The outcome is a handover that the client can sign with confidence, and an asset that works from the first day.
Plan for readiness to operate from day one, not in the final month.

A project that is paying less this month is not necessarily spending less overall. Savings are proven by the forecast at completion, not by the cash curve.

A lower unit rate is only the start of the story. The real comparison is net value across function, transition cost, whole-life cost and risk.

A progress percentage can look healthy while cost and time risk build up underneath. Verified progress, based on accepted work, tells the real story.